TM 44 Air Conditioning Inspection Reports By Www Airconditioninginspetion Org


Behdad Yazdani is answering some common questions on TM 44 Air Conditioning Inspection Reports; he also explains why it is important to make yourself familiar with TM44 Legislations and Air con reports

London, UK (I-Newswire) September 24, 2012 - What does a TM 44 air conditioning inspection cover?

Let me clarify an important fact here before giving any answers.

Air conditioning inspection is a visual inspection.

Let me divide the answer into 2 different categories:

The first category is what we do it TM 44 inspections and second actions is what we don't in air conditioning inspections we check the condition of indoor and outdoor units of air conditioning systems. We also check to see if the units are operational.

In TM 44 inspections we check the pipework insulation. We also check the compressors to see if they are functional.

One of the most important subjects we have to cover as a part of air conditioning survey is the refrigerant leakage.

Majority of refrigerants which has been used in old air conditioning systems are not ozone friendly refrigerant so when they escape from to atmosphere they damage the ozone.

As an air conditioning inspector it is our responsibility to spot any leakage in the system and notify the site manager on this matter.

As an energy assessor we have to run series of calculations to see whether the system is sized OK.

Get a free quote for TM 44 Air Conditioning Inspection Reports at http://www.airconditioninginspetion.org

If the system is oversized or under sized we have to right recommendations in TM 44 report and advise the site engineers on relevant actions they can take to solve the issue.

As a low carbon consultant an air conditioning energy assessor has a responsibility to make suggestions on reducing the energy consumption in the building specially those which effect the consumption of electricity in the air conditioning systems.

In fact in TM 44 report we give advices on building fabric such as insulation of walls and roofs, double glazing and infiltration.

We also give some advises on heating and hot water systems in air conditioning inspection report such as minimising simultaneous operation of heating and cooling.

Also uninsulated hot water pipework would have a negative effect on energy consumption of cooling systems.

We also make comments on energy consumption patterns in the building as excess energy consumption would increase the cooling load. In TM44 inspection report we normally make comments on computers and lights which has been left on.

Changing the traditional florescent and tungsten lamps with compact florescent and LED lamps is a part of our TM44 report.

One of the most important factors in energy consumption which we cover in air conditioning survey is the control system.

One of the most important parts of air conditioning inspection reports is the control system.

No matter how efficient your system is if you can't control it properly it would become inefficient.

In TM 44 inspection we cover all type of control systems such as BMS control systems and wall mounted control systems.

One of the most comments recommendations in TM44 inspection is setting the ONOFF periods based on room occupancy. Also we recommend a suitable room temperature for each area based on standard guidance.

In TM44 inspections we have inspect every element of the building affecting the cooling load and also every system providing the cooling into the conditioned areas.

You can order TM 44 Air Conditioning Inspection Reports at http://www.airconditioninginspetion.org

In more complicated buildings when we are dealing with chiller units and air handling units we have to carry out level 4 air conditioning inspections so we have to cover more system in the TM 44 inspection and also make slightly different comments.

For example we check the air flow control methods in the AHU to see whether we have motorised dampers or just manual dampers.

We have to check the efficiency of fans as well to find out if they use correct amount of electricity for the amount of air they deliver.

In TM 44 inspections we also look for variable speed drives or inverters. The main responsibility for these systems is to optimise the energy consumption.

It is also very important to find out whether we can use any renewable energies such as solar panels, wind turbines, biomass boilers etc...

As an air conditioning inspector we have responsibility to make comments on health and safety as well if we identify any hazards we have to report it to the site manager.

How many units should be inspected as a part of TM 44 inspections?

Base on TM44 guideline we have to inspect 10% of the units or minimum of 3 for level 3 air conditioning inspection but in level 4 TM 44 inspections we have to inspect all air handling unit, all chiller and condenser units all control systems, we also need to inspect 1 out of 50 fan coil units and chilled beams.

http://www.airconditioninginspetion.org is nationwide service provider for air conditioning inspections, TM 44 Inspections and air conditioning surveys.

We are professional energy assessors and building services consulting engineers based in London, providing independent professional expertise in mechanical engineering for buildings and strategic energy advice. We are designers and specifiers of heating-cooling systems, and pride ourselves in finding innovative cost-effective and energy efficient solutions for new and existing buildings.

CONTACT

Press Contact:
Behdad Yazdani - Low Carbon consultant
+44- (0)2081440820
http://www.airconditioninginspetion.org
futurebyenergy@london.com






About Future BY Energy

http://www.airconditioninginspetion.org is nationwide service provider for air conditioning inspect   More..ions, TM 44 Inspections and air conditioning surveys.We are professional energy assessors and building services consulting engineers based in London, providing independent professional expertise in mechanical engineering for buildings and strategic energy adviceLess..

Contact Information

Future BY Energy
Behdad Yazdani
139 St Elmo Road, Shepherds Bush
W12 9DY
Phone : 4402081440820

Published in:

Technology > Business

Published On:

September 24, 2012

Print Release:

Print Release

If you have questions regarding information in this press release contact the company listed above. I-Newswire.com is a press release service and not the author of this press release.The information that is on or available through this site is for informational purposes only and speaks only as of the particular date or dates of that information. As some companies and PR Agencies submit their press releases once per week,month or quarter, make sure to check the official company website for accurate release dates as our site displays the I-Newswire.com press release distribution date only.We do not guarantee the accuracy or completeness of information on or available through this site, and we are not responsible for or omissions in that information or for actions taken in reliance on that information.


Related Releases

Skyhigh Networks Partners with Sequoia Capital, Raises $20M in Series B Financing
Skyhigh Networks also unveils “30-in-30 Challenge” that guarantees participants discovery of 30 unknown cloud services in use by their organization in 30 minutes

Christie CTO Paul Salvini Keynote Speaker at New High Performance Displays Conference in Vancouver
“Visual interface” is focus of new stream for the annual SID Market Focus Conference at Display Week 2013

Vuclip Redefines Mobile Ad Effectiveness Metrics; Provides Third Party Authentication with Millward Brown
Vuclip provides insights into key brand metrics for mobile beyond click-through-rates to help brands achieve engagement and attention; Millward Brown study results revealed

Netmagic to Open New Data Center in Bangalore India
First data center to combine Netmagic and NTT Communications’ engineering and operations expertise

Top Telecommunication Company Traces the Culprit with Micro Technologies'Micro ISS Security Solution
Micro ISS is a solution to all security needs. With innovative features of live monitoring with CCTV camera both internally and externally weather proof . 24/7 recording can be viewed anytime in seconds around the world. Clear recording at night.